Hillsdale Boulevard & Alameda de las Pulgas Traffic Signal Project

Ways to Get Involved

About the Project

The City of San Mateo will install a new traffic signal at the intersection of Alameda de las Pulgas and Hillsdale Boulevard (see project area map below). The project will improve how people travel through the intersection by way of walking, biking, rolling, driving, and taking transit. In 2017, a traffic signal was requested at the intersection through the Hillsdale/Beresford Traffic Action Plan. Staff conducted a signal warrant analysis to determine if the intersection would qualify for a signal based on engineering metrics and requirements and found that the intersection met the conditions to justify a traffic signal installation.  

The project will include:

  • Slurry seal work at the intersection. 
  • Partially protected intersection to facilitate bike movements, shorten crossing distances for pedestrians, and force more right-angle turns for drivers. 
  • Installation of traffic signal equipment: 
    • Accessible pedestrian signals 
    • Improved safety lighting 
    • Vehicle signals 
  • Protected left turns on Alameda de las Pulgas: 
    • New lane striping at the intersection.
    • New crosswalk striping at the intersection. 

We would like feedback from the community on the final design for the intersection which seeks to ensure safety for all users and reduce congestion at Alameda de las Pulgas & Hillsdale Boulevard.

View the final project design at this link: Final Signal Project Design Concept. Please refer to the virtual meeting recording within the “Ways to Get Involved” section. Staff will be incorporating additional feedback received from the public in the follow-up October 2025 meetings within the final designs and hold to the project timeline as below to implement both the signal and intersection improvements necessary for this project.

Project Updates

November 2026

The Project was advertised for construction bids in October 2026, and the apparent low bidder has been identified. Staff anticipates bringing the construction contract for this project to City Council for award by the end of 2026. The Project remains on track with the schedule shown in the project timeline below.

Project Location

Map description: The map shows the proposed project location at the intersection of Alameda de las Pulgas and Hillsdale Boulevard in San Mateo. The project is located near Abbott Middle School and Hillsdale High School to the west and Hillsdale Branch San Mateo Public Library and Laurel Elementary School to the east. West Hillsdale Park and East Hillsdale Park are located north of Hillsdale Boulevard. The map includes a north arrow and a scale indicating 0 to 500 feet.

Map description: The map shows the proposed project location at the intersection of Alameda de las Pulgas and Hillsdale Boulevard in San Mateo. The project is located near Abbott Middle School and Hillsdale High School to the west and Hillsdale Branch San Mateo Public Library and Laurel Elementary School to the east. West Hillsdale Park and East Hillsdale Park are located north of Hillsdale Boulevard. The map includes a north arrow and a scale indicating 0 to 500 feet.


Project Timeline

Project timeline illustrating project activities and milestones from Fall 2023 through Summer 2027

The project timeline includes the following activities and anticipated schedule:

Fall 2023 – Spring 2024

  • Traffic Analysis

  • Stakeholder and Community Engagement

Fall 2023 – Winter 2024

  • Preliminary Design

Spring 2024 – Fall 2025

  • Project Design

Summer – Fall 2025

  • Follow-Up Community Engagement

2024 – 2026

  • S&I Bike & Ped Updates

Winter 2026

  • Project Bid and Award

Summer 2027

  • Construction Project