Gramercy Drive Subdrain Improvement Project

Project overviewGramercy Drive project zone

The Gramercy Drive Subdrain Improvement Project anticipates installing a pipe to help drain water that could be penetrating the soil under the roadway. Once the subdrain is installed, we anticipate following up with roadway rehabilitation in the same area to prevent further water penetration. All improvement work will require a closure of the northbound traffic lane. One-way traffic control will be required during construction. Access to driveways will be maintained during each phase.

Anticipated Schedule:

Installation of the subdrain is anticipated to begin in 2020 and roadway rehabilitation will follow. Schedule is subject to change. Area residents will receive a mailed notification once the project is approved. 

Notifications:

Notice of Construction - Sept. 9, 2020 / Notification Area MAP