Go To Search
Projects in the Preliminary Design Phase

Borel Park and Fire Station 25
The Parks and Recreation Department is working with the community to develop a preliminary design and design development drawings for Borel Park. With the possible relocation of Fire Station 25 to the south portion of the site, funding for improvements to the Boral Park site may become available.

Laurelwood Park and Sugarloaf Mountain Open Space Segment 3 Trail Improvements
The Parks and Recreation Department is working with the Trail Center, the cities volunteer trail group, to provide improvements to the Segment 3 trail in the Laurelwood Park/ Sugarloaf Mountain Open Space. The trail was identified in the Management Plan adopted in October 5, 2015. Work is planned for the fall of 2018.

Beresford Park Play Area Shade
The Parks and Recreation Department is working the designs for unique shade structures to provide shade for the metal slides, small tot lot play structure, and the picnic area. We hope to have some of the shade installed before July of 2017.



San Mateo City Hall – 330 West 20th Avenue, San Mateo, CA 94403

CivicPlus Content Management System © 1997- CivicPlus. All rights reserved.
All content © 2006- San Mateo, CA and its representatives. All rights reserved.